1. Set the leveling shoes and adjust the height of the unit.
  2. Load some B4 paper in the 2nd tray of the main machine, and make several copies.
  3. Check paper skew and side-to-side registration and correct if necessary.
  4. Peel the tape from the accessory mylar strip.
  5. Attach the mylar aligned along the edge of the entrance guide plate of the downstream unit.
    • The gap between the mylar and the edge should be within 2 mm at [A].
    • The gap between the mylar and the edge should be within 1 mm at [B].