Always observe the following points when moving the finisher.

  • To prevent damage to the connection brackets, never attempt to move or change the position of the system with the LCT, the finisher (or any other downstream peripheral) connected.

  1. Turn the system off.
    • Press the operation power switch on the left corner of the main machine to turn the machine off.
    • The power-down alert message appears on the operation panel. Wait for the operation panel to turn off.
    • Switch off the main power switch.
  2. Unplug the main machine from the power source.
    • Grip the head of the plug firmly, and then pull it out.
    • Never pull on the cord.
  3. Disconnect the finisher I/F cord from the upstream unit (or main machine).
  4. Make sure that the front door of the finisher is closed.
  5. Loosen the screws of the caster cover (x2).
  6. Push the caster up until it stops and is not touching the floor.
  7. Tighten the caster cover screws.
    • This prevents the caster from snagging on a carpet or door jamb when the finisher is pushed along the floor.
    • After the finisher has been moved to its new location, lower the caster again and tighten the screws.