The main power switch is located inside the front left door. This machine should be left on at the end of the work day.

 

The main power switch should always be turned off before servicing the machine.

Always follow the procedure below to shut down the machine before servicing.

  • Never turn the machine on with the LD unit or the canopy cover removed.

    1. Push the operation power switch [A] on the front left corner of the machine.
    2. A message appears and tells you to wait until the machine powers down completely. This gives the hard disk drive enough time to stop rotating and to shut down safely before the machine loses power.
    3. Wait for the operation panel to switch off.

    4. Open the left door and turn off the main power switch [B].
    5. Unplug the machine from the power source.
    6. Allow the machine to cool for a few minutes.
      • The polygon motor may continue to rotate for approximately one to three minutes after the machine has been switched off.
      • This also allows time for the fusing unit to cool.