[1]

Main Unit

[2]

Vacuum Feed LCIT RT5100

[3]

Bridge Unit BU5010

[4]

LCIT RT5080

  1. Attach the two joint brackets [A] provided with this option to the right side of the downstream vacuum feed LCIT (x 2 each: M5x10).
    Upper side

    Lower side
  2. Remove the plate [A] from the right side of the bridge unit (x4).
  3. Dock the downstream vacuum feed LCIT. To do this: Insert the upper joint pin [A] and the lower joint pin [B] on the left side of the bridge unit into the holes in the joint brackets on the downstream vacuum feed LCIT.
    Upper Side

    Lower Side
  4. Attach the leveling shoes [A] and then adjust the height so that the tops of the units are at the same level (Four locations: front left, front right, rear left, rear right).
  5. Fix the upper joint bracket to the bridge unit (x2: M5x10).
  6. Fix the lower joint bracket to the bridge unit (x2: M5x10).
  7. Remove the rear cover [A] from the bridge unit (x5).
  8. Connect the harness of the rear side of the bridge unit to the downstream vacuum feed LCIT (x5).
  9. Route the harnesses so that the clamp is between the bands [A].
  10. Re-attach the removed covers.