[1]  | Main Unit  | 
[2]  | Vacuum Feed LCIT RT5100  | 
[3]  | Bridge Unit BU5010  | 
[4]  | LCIT RT5080  | 
- Attach the two joint brackets [A] provided with this option to the right side of the downstream vacuum feed LCIT (
x 2 each: M5x10).
Upper side
Lower side - Remove the plate [A] from the right side of the bridge unit (
x4).
 - Dock the downstream vacuum feed LCIT. To do this: Insert the upper joint pin [A] and the lower joint pin [B] on the left side of the bridge unit into the holes in the joint brackets on the downstream vacuum feed LCIT.
Upper Side
Lower Side - Attach the leveling shoes [A] and then adjust the height so that the tops of the units are at the same level (Four locations: front left, front right, rear left, rear right).
 - Fix the upper joint bracket to the bridge unit (
x2: M5x10).
 - Fix the lower joint bracket to the bridge unit (
x2: M5x10).
 - Remove the rear cover [A] from the bridge unit (
x5).
 - Connect the harness of the rear side of the bridge unit to the downstream vacuum feed LCIT (
x5).
 - Route the harnesses so that the clamp is between the bands [A].
 - Re-attach the removed covers.