There are two paper bank heaters.

  • One is below Tray 1 and the other is below Tray 3.
  • The heaters are connected to the AC control board at the back of the machine.
  • Installation and connection of the heaters for this machine require removal of the rear cover.
  • The heaters can be connected to remain on always, or to switch on only when the main machine has been switched off. For more details, please refer to the main machine installation section.