• Make sure that the main machine is switched off and that its power cord is disconnected before doing the following procedure.

  1. If the A3 LCT is already installed, disconnect it and pull it away from the side of the machine.
    • Lock lever (x1)
    • Interface cable (x1
    • Ground screw (x1)
  2. Remove the screws from the right cover of the A3 LCT (x6).
  3. Hold the bottom of the right cover, push it to the left to disconnect the hooks at the top edge of the cover, and pull it away.
  4. Connect the heater assembly [A] and the cable [B] (x1).
  5. Pull out each tray until it stops. You do not need to remove them.
  6. Attach the heater assembly to the bottom plate of the LCT (x3).
  7. Attach the clamp [A] and the saddle clamp [B], and then close the clamps around the harness (x4).
  8. Re-attach the right cover (x6).
  9. Remove the left stay [A] from the A3 LCT (x4).
  10. Attach the two heater covers at the bottom left of the A3 LCT (x4).

    • The heater harnesses must pass between the two covers.
    • Make sure that the harnesses are not pinched between the covers.

  11. Re-attach the stay to the bottom left of the A3 LCT (x4).
  12. Remove the connector plate from the bottom edge of the main machine (x1).
  13. Push the LCT close to the main machine.
  14. Re-connect the green ground wire (x1).
  15. Connect the heater cable (x1).

    • Confirm that the relay harness and the ground wire are not pinched between the mainframe and the A3 LCT.