- Make sure that the main machine is switched off and that its power cord is disconnected before doing the following procedure.
- In order to use a second LCIT unit with this system, you will need to upload another software program into the machine firmware before connecting the second unit. For more details, contact your supervisor.
- Separate the A3 LCT from the Bridge Unit.
- Disconnect the rear cover [A] of the Bridge Unit (
x5),.
- Disconnect the right rear cover [A] of the Bridge Unit, raise it slightly, and then remove it (
x6).
- Disconnect the right left rear cover [A] of the Bridge Unit, raise it slightly, and then remove it (
x6).
- On the right side of the A3 LCT, remove the cover plate [A] at the lower right corner (
x1).
- Push the bridge unit against the side of the A3 LCT.
- Insert the connector of the relay harness [A] into the bracket connection of the Bridge Unit.
- Set the harness clamps as shown (
x4).
- Connect the heater harness from the A3 LCT to the end of the connector installed in the previous step.
- Set the saddle connector [A], and then set the harness clamps as shown (
x5).
Set the harness clamps and route the harness on the left.
- The bases of the clamps [A] and [B] are different sizes, so match the size of the base with the holes.
- Route the harness to the right [C] using the harness clamps provided.
- Connect the harness to the AC drive board.
- Re-attach the removed covers.