1. Disconnect the multi-folding unit from the upstream device.
  2. Remove the spacers from the multi-folding unit.
  3. Loosen the screws of the connecting bracket attached to the upstream device.
  4. Insert a spacer and tighten the screws.
    If the trailing edge is skewing toward the front of the machine, insert a spacer [B] under the rear end of the bracket and tighten the screws.
    -or-
    If the trailing edge is skewing toward the rear of the machine, insert a spacer [A] under the front end of the bracket and tighten the screws.
  5. Do another run to check the adjustment. If skew is still present, insert another spacer.
    • Each spacer is 2 mm thick.
    • Only two spacers are provided, so the maximum adjustment is 4 mm (using two spacers).