• When installing the PCDU, ensure that the lock lever is fit into the hole in the machine frame.
    [A]: The lock lever is properly fit into the hole in the machine frame.
    [B]: The lock lever is not properly fit into the hole in the machine frame.

  • After installing the faceplate, check the status of the lock levers (four) again by looking through the holes as shown below. The levers should be straight, as shown above [A], and not at an angle [B]. However, some force is required to attach the faceplate, and this could knock the levers out of their horizontal alignment.
    [A]: The lock lever is properly fit into the hole in the machine frame.
    [B]: The lock lever is not properly fit into the hole in the machine frame.
  • After installing the faceplate, check the status of the lock levers by pushing the PCDU.
  • If you cannot push the PCDU all the way in or fit the lock lever properly, remove the PCDU from the machine and do the following procedure.
    1. Remove the charge roller unit.
    2. Use the drum holders for the OPC drum, turn the drum counterclockwise for about 0.5 teeth of the gear and push it again.
  • Pro C5200S/C5210S: After you take the PCDU out of the machine and put it back, or replace it with a new one, carry out SP3-040-001 (DEMS: Execute).