1. Install the connecting bracket [A] on the left side of the upstream device.
    Example picture: Docking the finisher to the main machine

    • When the upstream device is the multi-folding unit, use the screw (M4×14) provided with the multi-folding unit.
    • When the upstream device is the de-curl unit, use the screw (M4×14) provided with the de-curl unit.
    • When the upstream device is not the multi-folding unit or the de-curl unit, use the screw (M4×20).

  2. Peel off the tape from the cushion [A], and then attach it to the left side of the main machine as shown below.
  3. Open the front door [A] of the finisher.
  4. At the front right corner, remove the screw of the lock bar [B], and then pull the lock bar toward you until it stops. (M3×6)
    Keep this screw. This screw is needed in later procedure.

  5. Slowly push the finisher [C] towards the left side of the upstream device.
    Make sure that the lock bar [B] of the finisher is directly and squarely under the arms of the connecting bracket [D].

  6. Attach the interface cable [E] at the rear of the finisher to the upstream device.

  7. Confirm that the height of the finisher entrance [A] is at the same height as the upstream device's paper exit [B].

  8. Push the finisher close to the side of the upstream device, and once again confirm that the height of the finisher entrance [A] is at the same height as the upstream device's paper exit [B].

  9. If the finisher is not at the same height as the upstream device, place the leveling shoes [A] and raise or lower the feet with the accessory wrench.

  10. Push the finisher against the side of the upstream device.

  11. Push the lock bar in completely so that it slides up into the notches in the arms on both ends of the connecting bracket, and then fasten the lock bar.
    Use the screw removed in Step 3.

  12. Check the height of the exterior of the upstream device and downstream device, and then adjust the height until the units are leveled.