• Unplug the power cord before starting the following procedure.

  1. Remove all the tape and shipping materials from the tray unit [A].
  2. Remove cover [A].
  3. Remove all tape and shipping materials from the transport unit [B].
  4. Remove the interface connector cover [A].
  5. Attach the rear connecting bracket [B] (M4x14).
  6. Attach the front connecting bracket [C] (M4x14).
  7. If the upstream device is the main machine, prepare the guide sheet [A] provided with the main machine.
    If the upstream device is not the main machine, proceed to step 11.
  8. Divide the entrance guide plate [A] into two parts.
  9. Remove the release paper from the guide sheet [A], and attach the guide sheet to the side of the upper entrance guide plate [B] which becomes the inner side when assembled.

    [C]: Position the edge of the guide sheet 5 mm inside from the edge of the upper entrance guide plate.
    [D]: Align the edge of the adhesive tape with the edge of the upper entrance guide plate.
  10. Reassemble the entrance guide plate [A].
  11. Peel the tape from the back of the sponge strip [A] and attach it as shown.
    [D]: 0 to 5 mm
  12. Attach the entrance guide plate [B] (M3x6).
  13. Remove the grounding plate [C] from the bottom cross-piece.
  14. Turn the grounding plate over.
  15. Reattach the grounding plate with the same screws as shown.
  16. Open the front door of the cover interposer tray.
  17. Pull out the locking lever [A].
  18. Align the finisher [B] with the connecting brackets [C], then slowly push the finisher onto the brackets.
  19. Connect the finisher cable [D] to the copier.
  20. Push in the locking lever.
  21. Check that the top edges of the finisher are parallel with edges of the finisher (or copier) to the right.
  22. Fasten the locking lever [A].
  23. Push the runners [A] and [B] in and re-fasten them again with the screws.
  24. Close the front door.