- These sheets used in steps 6, 11, and 12 are not provided as accessories; please do not forget to order them with the developer.
- Before replacing the developer, set SP3-701-024 to “1” and turn the main power switch OFF.
- If you have to turn the power on again before replacing the part, execute the SP again before replacing the part.
- After replacing the developer, turn the main power switch ON.
- If you replace developer together with the development filters, first replace the developer, then replace the filters.
- Remove the development unit. (PCU/Development Unit)
- Remove the bearing (front) [A]. (E-ring x1)
- Pull the shaft toward the blue arrow shown below, then remove the pin [A] and the gear [B].
- Remove the gear [A]. (
x1)
- Remove the bearing (rear) [A].
- Remove the development side seal and development case entrance seal [A] at each end.
Lift up the development sleeve unit [A].
- Do not touch or hold the development sleeve edge [A] when holding the sleeve unit. Otherwise, it may cause an injury.
Remove the developer after turning the development unit upside down in the reverse direction of the development filter.
- Rotate the gear to remove as much toner as you can.
- Stand the development unit up, and add new developer evenly across the width of the development unit while rotating the gear.
Reassemble the development sleeve unit, gear and bearing.
- The sheets for the development sleeve unit [A] must be under the sheets [B] for the development unit.
Correct
Wrong
- Wipe off the areas [A] indicated by the red-dashed line and paste new development case entrance seals to cover the blue-circled position.
- These seals are part of the development seal set, which must be ordered together with the new developer.
- The seal [A] for the front side is not the same shape as the one [B] for the rear side, as shown below. Be careful when you paste them.
- Paste the new development side seals [A] on the face of the development sleeve unit as shown below.
- These seals are part of the development seal set, which must be ordered together with the new developer.
- These seals are part of the development seal set, which must be ordered together with the new developer.
- Reassemble the PCU and development unit.
- Turn on the main power switch.
The machine detects the new developer and starts the initial adjustment.