- When installing this option, turn OFF the main power and unplug the power cord from the wall socket. If installing without turning OFF the main power, an electric shock or a malfunction may occur.
- Before installing this option, attach the "Bridge Unit BU3070 (D685)" or "Internal Multi-Fold Unit FD3000 (D3E4)" first.
- Attach the "LCIT PB3170/PB3230 (D695)" or "Paper Feed Unit PB3210/PB3220 (D787)" first before installing this option.
- Remove the external orange tape and shipping retainers.
- Open the front cover, and remove the orange tapes, shipping retainers and fixing bracket [A].
Keep the screws that were removed when removing the fixing bracket [A] and reuse them for attaching the supplied booklet stapler unit fixing cover [A] in step 4. - Pull out the saddle stitch unit and remove the fixing bracket [A] at the lower part of the finisher.
- Attach the supplied booklet stapler unit fixing cover [A]. (Booklet Finisher SR3240 only).
When attaching Punch Unit PU3060, it is not necessary to attach this cover. - Pull out the saddle stitch unit [A] again, and remove the orange tape and shipping retainers (Booklet Finisher SR3240 only).
- Remove the accessories in the package (fixing screws, etc.).
- Attach the shift tray [A] (
×1:3x8).
- Attach the booklet tray [A] (Booklet Finisher SR3240 only).
- Attach the entrance guide plate [A] (
×2: 3x6).
- Attach the ground plate [A] (
×2: 3x6).
Attach the joint bracket [A] to the machine (
×4).
Tighten the joint bracket [A] and bracket [B] of the bridge unit together.- Attach the screw so that the screw head is at the center of the mark.
- Attach the screw so that the screw head is at the center of the mark.
Clean the right side of the upper cover with a cloth moistened with alcohol, and then attach the cushion to the finisher.
Make sure that the cushion is aligned with the rear-lower edge [A] of the upper cover.
- Connect the cable of the finisher to the connector of the Internal Multi-Fold Unit. (Only when the Internal Multi-Fold Unit is installed.)
- Remove the screw on the connection lever [A] and pull the lever.
- Connect the finisher to the main unit, and then push in the connection lever [A] to fasten it to the main unit.
- Connect the interface cable [A] to the machine. (Only when the Bridge Unit is installed.)
- Set the staple cartridge [A].
- Attach the tray holder (
x2).
- Close the front cover.
- Turn ON the main power.
- Deliver some A3/DLT paper to the proof tray and check if the vertical registration is correct according to the adjustment scale for A3/DLT paper. (Finisher Registration Adjustment)
- Check that the finisher can be selected on the operation panel, and check the finisher’s operation.