• When installing this option, turn OFF the main power and unplug the power cord from the wall socket. If installing without turning OFF the main power, an electric shock or a malfunction may occur.

  • Before installing this option, attach the "Bridge Unit BU3070 (D685)" or "Internal Multi-Fold Unit FD3000 (D3E4)" first.
  • Attach the "LCIT PB3170/PB3230 (D695)" or "Paper Feed Unit PB3210/PB3220 (D787)" first before installing this option.

  1. Remove the external orange tape and shipping retainers.
  2. Open the front cover, and remove the orange tapes, shipping retainers and fixing bracket [A].
    Keep the screws that were removed when removing the fixing bracket [A] and reuse them for attaching the supplied booklet stapler unit fixing cover [A] in step 4.
  3. Pull out the saddle stitch unit and remove the fixing bracket [A] at the lower part of the finisher.
  4. Attach the supplied booklet stapler unit fixing cover [A]. (Booklet Finisher SR3240 only).
    When attaching Punch Unit PU3060, it is not necessary to attach this cover.
  5. Pull out the saddle stitch unit [A] again, and remove the orange tape and shipping retainers (Booklet Finisher SR3240 only).
  6. Remove the accessories in the package (fixing screws, etc.).
  7. Attach the shift tray [A] (×1:3x8).
  8. Attach the booklet tray [A] (Booklet Finisher SR3240 only).
  9. Attach the entrance guide plate [A] (×2: 3x6).
  10. Attach the ground plate [A] (×2: 3x6).
  11. Attach the joint bracket [A] to the machine (×4).
    Tighten the joint bracket [A] and bracket [B] of the bridge unit together.



    • Attach the screw so that the screw head is at the center of the mark.

  12. Clean the right side of the upper cover with a cloth moistened with alcohol, and then attach the cushion to the finisher.

    • Make sure that the cushion is aligned with the rear-lower edge [A] of the upper cover.



  13. Connect the cable of the finisher to the connector of the Internal Multi-Fold Unit. (Only when the Internal Multi-Fold Unit is installed.)
  14. Remove the screw on the connection lever [A] and pull the lever.
  15. Connect the finisher to the main unit, and then push in the connection lever [A] to fasten it to the main unit.
  16. Connect the interface cable [A] to the machine. (Only when the Bridge Unit is installed.)
  17. Set the staple cartridge [A].
  18. Attach the tray holder (x2).
  19. Close the front cover.
  20. Turn ON the main power.
  21. Deliver some A3/DLT paper to the proof tray and check if the vertical registration is correct according to the adjustment scale for A3/DLT paper. (Finisher Registration Adjustment)
  22. Check that the finisher can be selected on the operation panel, and check the finisher’s operation.