- When installing this option, turn OFF the main power and unplug the power cord from the wall socket. If installing without turning OFF the main power, an electric shock or a malfunction may occur.
- Before installing this option, attach the “Bridge Unit BU3070 (D685)” or "Internal Multi-Fold Unit FD3000 (D3E4)"first.
- Attach the “LCIT PB3170/ PB3230 (D695)” or “Paper Feed Unit PB3210/PB3220 (D787)” first before installing this option.
- This finisher is light and has a high center of gravity, so it easily topples when installing or moving it. Therefore, it is equipped with the stabilizer [A] attached to it when shipped.
- When you lift the finisher at the time of unpacking, do not hold the part [A]. Doing so may damage the frame.
- After unpacking, immediately attach the stabilizer [B] to prevent toppling.
Attach it along the guide rail [A] and push it in all the way, until it clicks. - Remove the external orange tape and shipping retainers.
- Open the front cover, and then remove the filament tape and packing materials.
- Remove the fixing bracket [A].
- Pull out the saddle stitch unit [A], and remove the filament tape and packing materials.
- Remove the accessories in the package (fixing screws, etc.).
- Attach the shift tray [A] (
x1; M4 x 8).
- Attach the booklet tray [A].
- Attach the entrance guide plate [A]. (M3×6)
- Clean the right side of the upper cover with a cloth moistened with alcohol, and then attach the cushion to the finisher.
Make sure that the cushion is aligned with the left-upper edge [A] of the upper cover.
If the internal multi-fold unit is installed on the main machine, the cushion is too long. So cut off a section of the cushion at the notch in the cushion, so that the cushion does not interfere with the I/F connector [A] of the finisher.
- Attach the ground plate [A] (M3x6).
Attach the joint bracket [A] to the machine (4x12).
Tighten the joint bracket [A] and bracket [B] of the bridge unit together.
If the machine is equipped with the internal multi-fold unit, attach the joint bracket [A] only.- Attach the screw so that the screw head is at the center of the mark.
- Attach the screw so that the screw head is at the center of the mark.
- If the internal multi-fold unit is installed, connect the finisher cable to the connector on the internal multi-fold unit.
- Remove the screw on the connection lever [A] and pull the lever.
- Connect the finisher to the main unit, and then push in the connection lever [A] to fasten it to the main unit. (
x1)
When the Internal Multi-Fold Unit is installed, check that the two cables of the finisher do not cross each other, before connecting the finisher. - Connect the interface cable [A] to the machine (only when the bridge unit is installed).
- Close the front cover.
- Turn ON the main power.
- Deliver some A3/DLT paper to the proof tray and check if the vertical registration is correct according to the adjustment scale for A3/DLT paper. (Finisher Registration Adjustment)
- Check that the finisher can be selected on the operation panel, and check the finisher’s operation.