- When installing this option, turn OFF the main power and unplug the power cord from the wall socket. If installing without turning OFF the main power, an electric shock or a malfunction may occur.
- Take out of the box, and remove the orange tape and shipping retainers.
- Pull out the finisher interface cable, and move it away from the machine.
- Remove the finisher rear cover [A] (
×3).
- Open the top cover, and then remove the arm [A] (
×1).
Open the finisher front cover, and remove the three knobs (
x1).
- Knobs with a lock mechanism are removed using a knob screwdriver or similar while releasing the lock.
- Pull the saddle stitch unit [A] or stapling unit.
Remove the finisher inner cover [A] (
×3).
- Remove the connector at the back of the inner cover.
- Remove the connector at the back of the inner cover.
- Cut off part of the finisher inner cover [A].
- Remove the supporting plate [A] (
×3).
- Remove the guide plate [A] (
×4).
- Insert and attach the hopper guide plate [A] from the front (
×4).
At this time, pass the harness [B] through the clamp [C]. - Attach the stay [A] (
×3).
Front [B]: Insert the holes in the stay over the embossed parts on the finisher.
Rear [C]: Place the shaft of the stay through the notch in the finisher. - Insert and attach the guide plate [A] from the rear (
×2).
- Insert and attach the side-to-side detection unit [A] from the rear (
×2).
Front: The two shafts of the unit are passed through bearings in the finisher. - Connect the harness [A] of the hopper guide plate to the relay connector [B] of the side-to-side detection unit, and then clamp the harness.
- Insert and attach the punch unit [A] from the rear.
- Attach the punch unit movement motor unit [A] so that the gear [B] meshes firmly (
×2).
- Insert the hopper [A].
- Connect the provided harness to the punch unit board [A] and the control board [B] of the finisher (
×6).
Use Harness (short) for SR3220 and Harness (long) for SR3210. - Remove the harness [A] from the clamp [B], and connect it to the punch unit board [C] (
×1).
- Connect the harness [A] of the side-to-side detection unit to the relay connector [B] of the harness (
×1).
- Connect the harness [A] of the punch unit movement motor unit to the punch unit board [B] (
×1).
- Attach the supplied cover [A] to the punch unit board.
- Clamp the harnesses.
For SR3220
For SR3210 - Reattach the finisher rear cover.
- Reattach the finisher inner cover and three knobs.
- Close the front cover.
- Close the top cover.
- Reconnect the finisher to the machine, and connect the interface cable.
- Turn ON the main power.
- Check that the punch can be selected at the operation panel, and check the operation.