- When installing this option, turn OFF the main power and unplug the power cord from the wall socket. If installing without turning OFF the main power, an electric shock or a malfunction may occur.
- Before installing this option, install the following options first;
1. Bridge Unit BU3070 (D685), or Internal Multi-fold Unit FD3000 (M482)
2. LCIT PB3260 (M496), or Paper Feed Unit PB3240 (M494)
- This finisher is light and has a high center of gravity, so it easily topples when installing or moving it. Therefore, it is equipped with the stabilizer [A] attached to it when shipped.
- When you lift the finisher at the time of unpacking, do not hold the part [A]. Doing so may damage the frame.
- After unpacking, immediately attach the stabilizer [B] to prevent toppling.
Attach it along the guide rail [A] and push it in all the way, until it clicks. - Remove the external orange tape and the shipping retainers.
- Open the front cover, and then remove the orange tapes and packing materials.
- Remove the fixing bracket [A].
- Pull out the saddle stitch unit [A], and remove the filament tape and packing materials.
- Remove the accessories in the package (fixing screws, etc.).
- Attach the shift tray [A] (
×1: M4 × 8).
- Attach the booklet tray [A].
- Attach the relay guide plate [A].
- Clean the right side of the upper cover with a cloth moistened with alcohol, and then attach the cushion to the finisher.
- Make sure that the cushion is aligned with the left-upper edge [A] of the upper cover.
If the internal multi-fold unit is installed on the main machine, cut off the section of the cushion indicated by the notch so that the cushion does not interfere with the I/F connector [A] of the finisher.
- Attach the ground plate [A] (M3x6).
- Attach the joint bracket [A] to the main machine (M4x12).
If the machine is equipped with the bridge unit, attach the joint bracket [A] together with the L type connecting bracket [B] of the bridge unit.
If the machine is equipped with the internal multi-fold unit, attach the joint bracket [A] only.
- Attach the screw so that the screw head is at the center of the mark.
- Attach the screw so that the screw head is at the center of the mark.
If the internal multi-fold unit is installed, connect the finisher cable to the connector on the internal multi-fold unit.
- Remove the screw on the connection lever [A] and pull the lever.
- Connect the finisher to the main unit, and then push in the connection lever [A] to fasten it to the main unit.
If the internal multi-fold unit is installed, make sure that the finisher’s 2 cables are not crossing each other before you connect the finisher. - Connect the interface cable to the machine (only when the bridge unit is installed).
- Close the front cover.
- Turn ON the main power.
- Deliver some A3/DLT paper to the proof tray and check if the vertical registration is correct according to the adjustment scale for A3/DLT paper (Troubleshooting for Finishing Options).
- Check that the finisher can be selected on the operation panel, and check the finisher’s operation.