Remove the rear middle cover.
- Check the position of bosses and hooks before removing the cover.
- Check the position of bosses and hooks before removing the cover.
- Remove the controller box cover [A].
- Cut off the port of the "LINE2" [A] and the slot next to it [B] of the controller box using a screwdriver.
Install the G3 interface unit [A] on the controller box.
- Insert the hooks of the G3 interface unit into the controller box when installing the G3 interface box.
- Insert the hooks of the G3 interface unit into the controller box when installing the G3 interface box.
- Connect the fax unit and the G3 interface unit with the flat cable [A].
- Attach the clamp [A], facing upward the [B] side and facing downward the [C] side.
- Reinstall the controller box cover and the rear middle cover.
- Attach the FCC decal on the rear cover of the machine (NA only).
- Keep the EMC address decal at the customer site (EU only).
- Connect the telephone cord to the "LINE2" jack.
- Insert the power plug into the outlet. Turn ON the main power of the machine.
Enter the service mode. Set Bit 1 of Communication Switch 16 to "1" (SP1-104-023).
Exit the service mode.
Turn the main power OFF then ON.
Print out the system parameter list. Check that "G3" is displayed as an option.
Set up and program the items required for PSTN-2 communications.