- Disconnect the clamp [A] and connector [B] from the second G3 interface unit.
 - Remove the G3 board [A] from the second G3 interface unit for the two-G3 board installation.
 - Install the G3 board [A] removed from the second G3 interface unit on the first G3 interface unit.
 Remove the rear middle cover [A].
- Check the position of bosses and hooks before removing the cover.
 
- Check the position of bosses and hooks before removing the cover.
 - Remove the controller box cover [A].
 - Cut off the covers for the "LINE2" [A] and "LINE3" [B] ports of the controller box using a screwdriver.
 - Cut off the cover of the port [C] using a screwdriver.
 Install the G3 interface unit [A] on the controller board.
- Insert the hooks of the G3 interface unit into the controller box when installing the G3 interface box.
 
- Insert the hooks of the G3 interface unit into the controller box when installing the G3 interface box.
 - Connect the fax unit and the G3 interface unit with the flat cable [A].
 - Attach the clamp [A], with the [B] side facing upward and the [C] side facing downward.
 - Reinstall the controller box cover and the rear middle cover.
 - Attach the FCC decal on the rear cover of the machine (NA only).
 - Keep the EMC address decal at the customer site (EU only).
 - Connect the telephone cords to the "LINE2" and "LINE3" jacks for double-G3 board installation.
 - Insert the power plug into the outlet. Turn ON the main power of the machine.
 - Enter the service mode. Set Bit 1 of Communication Switch 16 to "1" (SP1-104-023).
 - Set Bit 3 of Communication Switch 16 to "1" (SP1-104-023).
 - Exit the service mode.
 - Turn the main power ON then OFF.
 - Print out the system parameter list. Check that "G3" is displayed as an option.
 - Set up and program the items required for PSTN-2 communications.