Reassemble the ITB Unit.
Turn the main power switch ON.
Execute the following SP
Remove the front cover of the ITB cleaning unit, and rotate both levers of the ITB cleaning unit clockwise to retract the cleaning blades from the ITB.
Keep opening the font doors and enter the SP mode, and then execute SP2-920-001 (Steering Control Roller- Initialize Belt Position).
After pressing the “Execute” button, close both front doors to run the above SP.
Rotate both levers of the ITB cleaning unit counter-clockwise and re-install the front cover of the ITB cleaning unit.
Execute SP2-912-001(Encoder Sn:Adj Light - Adj Light Amt).
Exit the SP mode and then turn the main power switch OFF.
Turn the main power switch ON and then enter the SP mode.
Execute SP2-914-1 (Encoder Sn:Get 1stPhase - Get Phases:Execut All). This SP code resets the ITB speed feedback sensor.
Exit the SP mode and then turn the main power switch OFF.
Turn the main power switch ON and then enter the SP mode.
Select SP2-915-001 (Encoder Sn Ctrl Condition - Scale FB Control Enable) and confirm that it is set to default “1”.
If SP2-915-001 is set to “0”, clean the ITB Speed Feedback Sensor again.
Exit the SP mode and then turn the main power switch OFF.
Turn the main power switch ON and then enter the SP mode.
Execute SP3-011-004 (Manual ProCon :Exe - Full MUSIC)
Exit the SP mode.